Resolved

Datacenter Cooling Outage

Started 13 Aug at 08:51am PDT, resolved 14 Aug at 12:35am PDT.

CORE Cluster PHX-4
Resolved

Servers are up 100%. We will be closely monitoring everything overnight to make sure the infrastructure remains stable.

Posted 14 Aug at 12:35am PDT.
Updated

Repairs on the cooling system were completed and datacenter staff are powering up servers as the temperatures drop. We're currently at about 85% recovered, expecting the remaining servers to come online very soon. Thank you for your patience and grace as we work through this difficult time.

Posted 13 Aug at 04:11pm PDT.
Updated

HVAC techs have restored half of the main chilling system bringing more servers into the safe range to boot up. Temporary chillers have also been added to help expedite cooling efforts. The other half of the chilling equipment being repaired is expected to be finished by 12:30pm (pdt). Servers may come online before that as temperatures continue dropping across the datacenter.

Posted 13 Aug at 10:12am PDT.
Created

A major chiller equipment failure at the facility has significantly reduced cooling capacity, resulting in elevated temperatures and an increased risk of service disruption. The data center (PhoenixNAP) is actively working to restore normal cooling operations.

We understand the seriousness of this situation and the impact an extended disruption may have on your business. We will continue to provide updates as conditions change and additional information becomes available. We sincerely apologize for the disruption and appreciate your patience as we work to protect your infrastructure and restore normal operations.

Posted 13 Aug at 08:51am PDT.